Fusion Tower
Case Study
Fusion Tower
About
Fusion Tower is a landmark residential development in Manchester, delivered by Domis Construction as part of the wider Middlewood Locks regeneration. Rising 28 storeys, the scheme provides high-quality apartments with elevated views across the city, demanding robust, high-performance solutions that meet both aesthetic and stringent fire safety requirements.
To support this, we delivered our FLAMELESS glass balustrade system, a fully compliant A2,s1-d0 glass balustrade system for key upper levels of the tower, specifically floors 22 and 28. Our solution centred around the TL-6030 base profile, paired with 25.52mm Pyroguard Evo glass, ensuring a non-combustible system without compromising on transparency or design intent.
Working closely with the project team, we developed project-specific structural calculations to meet 1.50kN line load requirements alongside elevated wind load conditions typical of high-rise applications. The system was further enhanced with bespoke sloped cap rail sections and edge protection details, ensuring both safety and a refined finish aligned with the building’s architectural vision.
To streamline installation on site, all components were precision cut-to-size, reducing time on site and supporting efficient programme delivery. We also supplied the glass directly, ensuring full system compatibility and quality control from manufacture through to installation.
The result is a complete, high-performance balustrade solution that meets modern fire regulations while delivering the clarity and durability expected in a premium residential tower.
30mtrs
TL-6030
35m²
25.5mm glass
Only You
Cut-to-size
Calcs
Project specific