Palace Theatre

Case Study

PALACE THEATRE

About

The Palace Theatre in Swansea, a Grade-II listed building, has been revitalised through extensive restoration efforts. Once at risk due to its deteriorated condition, this 135-year-old venue is now safeguarded for the future.

In 2020, Swansea City Council acquired the building with plans to repurpose it as office space. This adaptive approach not only preserves but also addresses modern needs.

The TSS team, led by Balustrades Director Darryl Sweet and Operations Manager James Sweet, used traditional methods to meticulously template each floor’s curves, ensuring precise measurements. This allowed them to seamlessly blend OnLevel’s BendFit TL-6020 channel with the in-situ metalwork, designing and installing balustrades that honour the building’s beauty and meet current safety standards.

To achieve 1.50kN loadings, the team paired OnLevel’s BendFit TL-6020 with 21.52mm toughened laminated Sentry glass, expertly bending and powder-coating the channel to deliver a striking final result.

82mtrs

BendFit balustrade

Project Showcase

GALLERY